MIL-DTL-10057J
4. VERIFICATION
TABLE I. Requirements/verification cross-reference matrix.
CLASSES OF VERIFICATION
METHOD OF VERIFICATION
1 ANALYSIS
A FIRST ARTICLE
2 DEMONSTRATION (end item test)
B CONFORMANCE INSPECTION
3 EXAMINATION
4 TEST
Verification
Verification
SECTION 4
SECTION 3
DESCRIPTION
Method
Class
VERIFICATION
REQUIREMENT
12
3
4
A
B
3.1.1
First article inspection
X
X
X
X
4.2 and TABLE II
3.1.2
Conformance
X
X
X
X
4.3 and 4.3.2
3.2.1
Disc
X
X
X
X
4.3.2.1
3.2.2
Upper disc
X
X
X
X
4.3.2.2
3.2.3
Inner tube
X
X
X
X
4.3.2.3
3.2.4
Outer tube
X
X
X
X
4.3.2.4
Disc and fuze cord
XX
X
X
4.3.2.5
3.2.5
assembly
3.2.6
Priming paste support
XX
X
X
4.3.2.6
3.2.7
Spacer tube
XX
X
X
4.3.2.7
3.2.8
Cover and body assembly
XX
X
X
4.3.2.8
Cover and body loading
3.2.9
XX
X
X
4.3.2.9
assembly (BP-A1)
Cover and body loading
3.2.10
XX
X
X
4.3.2.10
assembly (A1-KP)
3.2.11
Hand grenade simulator
X
X
X
X
4.3.2.11
3.2.12
M3A1 igniter assembly
X
X
X
X
3.2.13
Safety fuze cord
X
X
X
X
4.3.2.5
3.2.13.1
Burning time of safety fuze
X
X
X
X
4.3.2.5
3.3
Moisture content
X
X
X
X
X
4.7.1
Flash composition moisture
3.3.1
X
XX
X
X
4.7.1
content
Flash composition
3.3.2
X
XX
X
X
4.7.2
formulation
Flash composition
3.3.3
X
XX
X
X
4.7.2
granulation
3.4
Jumble
XX
X
4.7.3
3.5
Functioning requirements
XX
X
X
4.5.3
3.5.1
Premature delay
XX
X
X
4.5.3
3.5.2
Sound level
XXX
X
4.5.3
3.5.3
Pull cord
XXX
X
4.5.3
3.6
Lot numbering
X
X
X
4.8
3.7
Workmanship
X
X
X
4.3.2
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business