4.5.2.2 Granulation test. A sample of sufficient size (see paragraph 4.7.2) of each ingredient
shall be selected for the granulation test at the time of loading the ingredient. A sample of sufficient
size shall be taken from a "dummy" body used in conjunction with the loading of the simulators for
determination of composition.
4.5.3 Functioning verifications. The simulator assemblies shall be observed for any evidence
of failure to comply with the requirements, as classified in Table V.
TABLE V
Defects
Classification
Premature (See 3.5.1)
Critical
Delay time (See 3.5.1)
Major
Sound level (See 3.5.2)
Major
Pull cord failure (See 3.5.3)
Major
Dud (See 3.5)
Major
4.5.3.1 Functional test for defects at ambient temperature (70° ± 5° F) (See Table V)
4.5.3.1.1 First three lots. Beginning with the first lot produced and continuing until three (3)
consecutive lots have complied with the requirements, 125 simulators shall be selected for this test.
75 simulator assemblies shall be functioned in the static phase and 50 simulators shall be functioned
in the non-static phase. The lot shall be rejected if, during the test, any of the following are exhibited
in the combined two phases.
a. One or more critical defects.
b. Six or more assemblies having major defects listed in Table V.
c. Average of all delay times for the combined phases of 4.5.3.1.1 and 4.5.3.2.1 is less than
8.5 seconds.
4.5.3.1.2 Successive lot test. After three consecutive lots have complied with the criteria of
4.5.3.1.1, fifty (50) simulators shall be selected from each lot for this test. 25 simulators shall be
functioned in the static phase and 25 simulators in the non-static phase (see 4.7.4.1.2). The lot shall
be rejected if, during the test, any of the below are exhibited.
a. One or more critical defects.
b. Three or more assemblies having major defects listed in Table V.
c. Average of all delay times for the combined phases of 4.5.3.1.2 and 4.5.3.2.2 is less than
8.5 seconds.
If the lot is rejected, the next lot produced will proceed as if it is the first lot being produced, and shall
follow the requirements of 4.5.3.1.1 and 4.5.3.2.1 until 3 consecutive lots are accepted.
23
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business