MIL-DTL-10057J
4.8 Lot numbering. All samples shall be examined for compliance with the requirements
specified in 3.6.
5. PACKAGING
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in
contract or order (see 6.2). When packaging of materiel is to be performed by DOD or in-house
personnel, these personnel need to contact the responsible packaging activity to ascertain packaging
requirements. Packaging requirements are maintained by the Inventory Control Point's packaging
activity within the Military Service or Defense Agency, or within the military service's system
command. Packaging data retrieval is available from the managing Military Department's or Defense
Agency's automated packaging files, CD-ROM products, or by contacting the responsible packaging
activity.
6. NOTES
(This section contains information of general or explanatory nature that may be helful, but is not
mandatory)
6.1 Intended use. The components covered in this specification are intended for use on the
Hand Grenade Simulator, M116A1. The components and assemblies covered by this specification
are military unique and have no commercial applications.
6.2 Acquisition requirements. Acquisition documents should specify the following:
a. Title, number, and date of this specification, and of all reference documents cited in
Section 2, and listed in Section 6 for information.
b. Provisions for submission of first article samples.
c. Provisions for submission of Conformance/Lot acceptance samples.
d. Packaging requirements (see 5.1 and 6.6).
e. Requirements for submission of acceptance inspection equipment (see 6.3).
f. Provisions for critical characteristic contract clause.
g. Statistical Process Control (SPC) clause.
6.3 Submission of acceptance inspection equipment. Acceptance inspection equipment
designs should be submitted as required to Commander, U.S. Army Armament Research,
Development and Engineering Center, Attn: RDAR-QEM-B, Picatinny Arsenal, NJ 07806-5000.
6.4 Distribution of ammunition data cards. Distribution of data cards should include the
following: Commander, U.S. Army Armament Research, Development and Engineering Center,
Attn: RDAR-QEM-B, Picatinny Arsenal, NJ 07806-5000.
6.5 Critical characteristics justification.
6.5.1 Short fuze delay. If the delay is short (less than five (5) seconds) then the end user may
get seriously injured. Also, same possibility that can happen as described in paragraph 6.5.5.
6.5.2 Any opening in assembly which charge may leak, or presence of charge on exterior of
assembly. If there are any leaks from the assembly or presence of charge on exterior of the assembly
27
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business