MIL-DTL-20517J (AR)
PARAGRAPH
TITLE
DRAWING NUMBER
8848486
NEXT HIGHER ASSEMBLY
4.3.2.21
Simulator Assembly Complete
---
No. of
Requirement
Paragraph Reference/
Category
Examination or Test
Sample
VL or 100%
Paragraph
Inspection Method
Units
Critical
1
Fuze assembly missing or not completed seated
100% & VII
4.5.7
3.2.21
2
Charge in impulse cartridge missing or below minimum
100% & VII
4.5.7
3.2.21
3, 4 & 5
Functioning (note 1)
4.4.6
3.4
4.5.5
Major
101
Fuze assembly obviously deviated from normal
100%
3.2.21
4.5.7
102
Wad or gas check washer missing
100%
3.2.21
4.5.7
103
Evidence of foreign material or any obvious workmanship
100%
3.2.21
4.5.7
defects
3.2.21
4.5.7
104
Charge case empty
100%
105
Top insecure or not fully seated
IV
3.2.21
Manual
106
Impulse cartridge above flush or greater than max below flush
IV
3.2.21
Gage
107
Length, max
IV
3.2.21
Gage
108
Protective coating missing or incomplete
IV
3.2.21
Visual
109
Sealing compound missing on top
IV
3.2.21
Visual
110
Marking misleading, illegible or incorrect
IV
3.2.21
Visual
111, 112 & 113
Functioning (note 1)
4.4.6
3.4
4.5.5
114
Chamber Gage
100%
3.2.21
4.5.8
115
Air leakage test
100%
3.6
4.5.6
Minor
4.4.6
3.4
4.5.5
201
Functioning (note 1)
202
Evidence of poor workmanship
II
3.7
Visual
Notes: Note 1: See table IV for details on functioning defects
25
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business