MIL-DTL-20517J (AR)
3.2.14 Closing disc. The closing disc shall have dimensions in accordance with drawing
8848482.
3.2.15 Charge case. The charge case shall have dimensions in accordance with drawing
8848483.
3.2.16 Charge case loading assembly prior to crimping closing disc. The charge case
loading assembly shall be in full compliance with drawing 8848485. It shall not be missing any
components, and before crimping the closing disc it shall have a fully seated fuze assembly with
pettman cement surrounding the fuze threads 360 degrees.
3.2.17 Charge case loading assembly after crimping closing disc. After crimping the
closing disc in accordance with drawing 8848485, the charge case loading assembly shall have a
crimp that seals the disc with cement and is flat against the closing disc at all points.
3.2.18 Signal case. The case shall have no radii missing with dimensions and finish in
accordance with 12991623.
3.2.19 Top. The top shall not have any cracks or splits and have dimensions in
accordance with drawing 8847473. The surface of the top shall not have any bare spots in the
protective coating or be missing coating.
3.2.20 Simulator assembly prior to installing top. The simulator assembly shall have all
components, no cracks or splits in metal parts and a sealed charge case assembly in accordance
with drawing 8848486.
3.2.21 Simulator assembly complete. The simulator assembly shall not have a fuze
assembly obviously deviated from normal or cracked, shall have not have any component
missing, shall not contain the presence of foreign material, shall not have propellant height lower
than minimum and be in accordance with drawing 8848486.
3.3 Fragmentation. The completed charge case assembly shall explode high order as
evidenced by the fragmentation of the cylindrical portion (see 6.8) of the charge case, drawing
8848483, into two (2) or more pieces. Fragmentation must occur due to the initial explosion
rather than to any secondary impact.
3.4 Dynamic functioning. The simulator assembly shall function dynamically in
accordance with the following requirements.
3.4.1 Case failure. The signal case shall not split, rupture, or bulge to the extent that it
sticks in the barrel of the pistol.
3.4.2 Burst. The charge case assembly shall not fail to burst, or fail to burst "high order"
as evidenced by a ball of smoke, a brilliant flash and loud report.
5
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business