MIL-DTL-20517J (AR)
TABLE II. First Article Inspection - Continued
NO. of
Requirement
Paragraph Reference/
Examination or Test
Sample Units
Paragraph
Inspection
Fuze assembly complete
(Dwg. 12977377)
Examination for defects
50
3.2.13
4.3.2.13
Closing disc
(Dwg. 8848482)
Examination for defects
20
3.2.14
4.3.2.14
Charge case
(Dwg. 8848483)
Examination for defects
20
3.2.15
4.3.2.15
Charge case loading assembly prior to
crimping closing disc
(Dwg. 8848485)
Examination for defects
50
3.2.16
4.3.2.16
Charge case loading assembly after
crimping closing disc
(Dwg. 8848485)
Examination for defects
50
3.2.17
4.3.2.17
Fragmentation test
20
3.3
4.3.2.17
Flash powder
4.4.3
3.2.2
4.3.2.2
Signal Case
(Dwg. 12991623)
Examination for defects
20
3.2.18
4.3.2.18
Top
(Dwg. 8847473)
Examination for defects
20
3.2.19
4.3.2.19
Simulator assembly prior to installing top
(Dwg. 8848486)
Examination for defects
50
3.2.20
4.3.2.20
Simulator assembly complete
(Dwg. 8848486)
Examination for defects
50
3.2.21
4.3.2.21
Air leakage test
50
3.6
4.3.2.21
Dynamic functioning test
50 (note 1)
3.4
4.3.2.21
Note 1: Above units must be functioned
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business