MIL-DTL-20517J (AR)
3.4.3 Burst time. The charge case assembly shall burst in no less than 2.2 seconds and no
greater than 3.2 seconds.
3.4.4 Expelling time. The charge case assembly shall not fail to expel within 150
milliseconds on functioning of the primer.
3.4.5 Horizontal distance and altitude. The charge case assembly shall not burst at a
horizontal distance of less than 30.5 meters from the pistol or at an altitude of less than 15.25
meters.
3.4.6 Primer functioning. The primer shall not fail to function.
3.5 Primer deterioration. If the total elapsed time between original acceptance of any
primer lot and the assembly of that lot into the simulator assemblies exceeds two years, or if the
primers have been subjected to adverse conditions, however brief, at any time since previous
tests, the primer lots shall be subjected to and must satisfactorily pass the check test in
accordance with 4.4.7. The check test shall be performed prior to assembling the primers into the
simulators.
3.6 Air leakage. The simulator shall show no evidence of leakage.
3.7 Workmanship. All manufacturing, processing, and assembly operations shall be
correctly performed. They shall be clean and free of burrs, sharp edges, unblended radii, surface
defects, chips, dirt, grease and oil (except where specifically required), corrosion products and
other foreign matter. The cleaning method used shall not be injurious to any part or assembly
nor shall they be contaminated by the cleaning agent. Exterior surface coatings shall be
continuous except for a few light scratches not exposing base material. All required markings
shall be neat and sharply defined.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business