MIL-DTL-10058J
DRAWING NUMBER
7549246
4.3.2.13
Assembly.
NEXT HIGHER
ASSEMBLY
CONFORMANCE REQUIREMENT
EXAMINATION OR TEST
INSPECTION
CLASSIFICATION
CRITERIA
PARAGRAPH
METHOD
Critical
1
Any opening in assembly through which charge
100%
3.2.12
Visual
may leak, or presence of charge on exterior of
100%
3.2.12
Visual
assembly
2
Safety clip missing, insecurely engaged or
3
incorrectly positioned
Note a
3.5
4.5.3, 4.7.4
Premature functioning (time from initiation to
detonation less than 5 seconds)
Major
101
Fuze tape or sealing tape missing, peeling or
VL-IV
3.2.12
Visual
incorrectly applied
102
Vent hole missing in fuze tape
VL-IV
3.2.12
Visual
103
Cement missing or inadequate at safety fuze or
VL-IV
3.2.12
Visual
disc contacting surface (as applicable)
104
Paint on igniter blasting fuze will interfere with
VL-IV
3.2.12
Visual
removal of cap and pull cord
105
VL-IV
3.2.12
Visual
Assembly cut, punctured, dented or deformed
106
VL-IV
3.2.12
Gage
Total length
107
VL-IV
3.2.12
Visual & Manual
Label missing or insecurely attached
108
Note a
3.5
4.6.3
Delay time (safety fuze delay between (5) to
six (6) seconds DWG 7549246
NOTES:
Note a. Sample size shall be selected in accordance with 4.5.3
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business