MIL-DTL-10058J
4.5.2.2 Granulation test. A sample of sufficient size (see paragraph 4.7.2) of each
ingredient shall be selected for the granulation test at the time of loading the ingredient. A
sample of sufficient size shall be taken from a "dummy" body used in conjunction with the
loading of the simulators for determination of composition.
4.5.3 Functioning verifications. The simulator assemblies shall be observed for any
evidence of failure to comply with the requirements, as classified in Table V.
TABLE V
Defects
Classification
Premature (See 3.5.1)
Critical
Delay time (See 3.5.1)
Major
Sound level (See 3.5.2)
Major
Pull cord failure (See 3.5.3)
Major
Audible whistle (See 3.5.4)
Major
Dud (see 3.5)
Major
4.5.3.1 Functional test for defects at ambient temperature (70° ± 5° F) (See Table V)
4.5.3.1.1 First three lots. Beginning with the first lot produced and continuing until three
(3) consecutive lots have complied with the requirements, 125 simulators shall be selected for
this test. 75 simulator assemblies shall be functioned in the static phase and 50 simulators shall
be functioned in the non-static phase. The lot shall be rejected if, during the test, any of the
following are exhibited in the combined two phases.
a. One or more critical defects.
b. Six or more assemblies having major defects listed in Table V.
4.5.3.1.2 Successive lot test. After three consecutive lots have complied with the criteria
of 4.5.3.1.1, fifty (50) simulators shall be selected from each lot for this test. 25 simulators shall
be functioned in the static phase and 25 simulators in the non-static phase (see 4.7.4.1.2). The lot
shall be rejected if, during the test, any of the below are exhibited.
a. One or more critical defects.
b. Three or more assemblies having major defects listed in Table V.
If the lot is rejected, the next lot produced will proceed as if it is the first lot being produced, and
shall follow the requirements of 4.5.3.1.1 and 4.5.3.2.1 until 3 consecutive lots are accepted.
4.5.3.2 Inspection for defects at cold temperature (minus 65 + 5° F) (See Table V).
4.5.3.2.1 First three lots. Beginning with the first lot produced and continuing until 3
consecutive lots have complied with the acceptance criteria, 80 simulators shall be selected from